Beverly Oaks Homeowners Association First Voting Period 2016to be completed on February 19, 2016 You will receive a confirming copy of your choices by e-mail. If you do not receive the confirmation within 5 minutes, please re-vote.
Project A: Street Repairs Overview: The community streets have failed in 27 locations and are in a state of deterioration at those locations. Proposed: It is proposed that the Association dispense between $40K - $50k from the capital budget to make these repairs and seal the remaining cracks with a clear colored sealant to slow down roadway deterioration. Download pdf to see map of repairs needed. Impact: There is no impact on monthly dues rate. The project is currently out to bid to 10 contractors.
Project B: Repair of the Mailboxes Overview: There is one rotted mailbox pedestal that need to be replaced. Repairs to the mailboxes are in the capital plan approved by the owners. Plan: It is planned that the Association replace one rotted pedestal and paint and clean the mailboxes. . Impact: The Post Office will not deliver to a broken distal. This expense will be drawn from the capital reserves - there is no impact on monthly dues rate.
Project C: Miscellaneous Repairs to Railings, Marble, and Letters at the Entry Overview: There are three repairs needed at the entry. Repairs to the entry are in the capital plan approved by the owners. Planned: 1. Repair of a rotted section of iron railing. This repair will and prevent the railing from falling and stop further damage (click on photo to enlarge). 2. Reattach the marble tiles that have come loose. The marble tiles have separated from the wall. This repair will stop the tiles from falling and prevent further separation. 3. Correct the mismatching colors in the name plate. This will be done by moving two letters from one sign to the other and purchasing 3 new letters. Impact: Doing the work will prevent further rusting and separation of the tiles and more costly repair at a future time. This expense will be drawn from the capital reserves - there is no impact on monthly dues rate.
2016 BUDGET
A detailed breakdown of these expenses is located here . The following additional projects (see below, if approved, will be additive to the 2016 rate stated above.
Section 4: Safety Renovations Funded by TxDOT Overview: The Association successfully petitioned the State of Texas for $25,000 to make safety changes to the exit onto Highway183. Approved: The plan is to relocate the traffic spikes to the required 30 foot setback, to lower the screening wall to see oncoming traffic, to relocate the electrical services, and add high visibility signage/lights to manage community traffic. Schedule: The work will be done in 2015-16, before road construction which has both tax and cost advantages. Impact: Funded by TxDOT. No impact on monthly dues rate or the capital reserve. This is a self funded project.
Updated 02/18/16
After you submit your ballot, a confirmation window should appear. You will also get a confirmation e-mail with your vote selections.