PROJECTS

Irrigation Renovation and Maintenance

MockupMany of the long term turf issues in the community are related to irrigation failures and/or shade of maturing trees.

An analysis of the irrigation system showed that there were severely damaged or sub-optimal areas and that they affected 40% of the homes in the community.

Renovations and repairs included the repairs of underground line breaks at 1617 and 1620 that have rendered the area from 1600 - 1622 non functional for 6 or more months; broken underground wires and valves that causing the Wilshire cul-de-sac and part of Wilshire Lane (1916-1922) to be down for 6 months; re-engineering of an abandoned valve at 2005 Wilshire that has caused 1913-1917 to be down for 2 years; line obstructions that have caused the bed sprinklers at 1910 to be down for a year or more; a broken valve at 1911 that caused failure of service to 1905, 1907, 1909, 1911, 1911 - down since 2008; and low line pressure causing a watering shortage to 2011-2021.

In addition to basic repairs and replacements, a new zone had to be created for 122, 1916-1922. The underground line problems were too extensive to be repaired. To resolve chronic line pressure problems on Wilshire drive from over loaded zones, 3 new plumbing/zones were created.



Updated 04/16/16

DIRECTORY

Association Purpose
Community News
Financial Overview
Landscaping
Exterior Painting
Mail Room
Infrastructure Repairs
Architect Standards
Calendar
Roofers, Handymen
Board of Directors
For New Owners
For Renters
Photos
Records Online
Driving Directions
Contact Us